Search for solar power locations
Basic criteria include:
10 to 15 hectares and not Grade 1 or Grade 2 farmland;
level or south facing;
no conservation status or public rights of way on the site;
access to power lines without crossing another property;
no trees, buildings, telecoms masts or other structures within the site;
able to be secured with 2.5-metre fencing all round;
not at risk of flooding;
at least a mile inland, as sea winds can scratch solar panels;
in a location with minimal visual impact on neighbours.
Advertisement
Hide AdAdvertisement
Hide AdCharlotte Favill, of Strutt & Parker in Stamford, says there is an opportunity to take advantage of feed-in tariffs for renewable energy that are valid for schemes accredited before April 2012.
She said: "Examples of rental offers being made are a base rent in the order of 50,000 per site per annum with a top-up based on the electricity generated to give a rent of between 60,000 and 75,000 per annum. Leases are up to 25 years, with rent reviewed annually."
Call her on 01780 484040 or email [email protected]/
CW 20/11/10