New phone mast installed near to shopping parade as part of continued 5G roll out
The mast, in Ormesby, is only a short distance away from a temporary structure that previously triggered residents' complaints.
A new 5G mast has been installed close to a local shopping parade in Ormesby, Middlesbrough.
Workers were seen erecting the mast on Allendale Road earlier this week which is a replacement for an existing older mast that only had 4G network capability.
The 20 metre high pole and ancillary equipment – termed a base station – has been sited on a grass verge between the highway and a footpath.


In most instances such infrastructure is regarded as ‘permitted development’, meaning planning permission does not have to be acquired from the local authority – Redcar and Cleveland in this instance – although statutory public notices informing of any installation still have to be published and stakeholders such as local councillors informed, and objections can still be raised.
A ‘pre application notice of intent’ for new telecoms equipment issued by a surveying firm last month on behalf of network infrastructure services company MBNL said an “option has been identified to extend connectivity offering potential to enable planning for 5G implementation”.
Meanwhile, a letter associated with the plans said they were a replacement for decommissioned equipment previously used by EE and Three on Spencerbeck House, in Ellerbeck Way, Ormesby – a nearby high rise tower block which is due to be demolished in the summer – and would “maintain coverage and capacity within the local area”.
The Government is keen to encourage mobile connectivity for people and businesses via 5G with faster networks also deemed crucial to drive productivity and growth.
It’s unclear what the new installation means for a much bigger temporary mast erected on land off Normanby Road last year, also operated by MBNL on behalf of the same mobile providers, which sparked complaints from local residents, and whether this may be eventually removed as a result.
People living near to the structure expressed concern about noise and vibrations being emitted at various times of the day, disturbing sleep, and of the visual impact amid fears it could affect house prices.
Housing firm Beyond granted a 12 month licence to MBNL to occupy the land, while stressing in a statement last year that it had not offered the site as a “solution” to MNBL and was not being paid for the licence granted.
MBNL and representatives of EE and Three have been contacted in order to provide a potential update.