Work repairing Linton Bridge going well

Major stabilisation works on Linton Bridge after the devastating 2015 Christmas floods have now been completed.
Repairs to Linton Bridge overthe River Wharf are well underwayRepairs to Linton Bridge overthe River Wharf are well underway
Repairs to Linton Bridge overthe River Wharf are well underway

The Grade II-listed structure over the River Wharfe has been closed for more than 12 months, but work is progressing well. It will however be summer before the residents of Linton and Collingham are re-united.

Related topics: