A61 laybys to close alongside A616 for maintenance works

Laybys along two major South Yorkshire roads are set to close as part of long-term maintenance works.

National Highways has announced plans to temporarily close laybys along stretches of the A61 and A616 to allow routine maintenance to be carried out safely.

On the A61, closures will affect laybys on both the northbound and southbound carriageways between Tankersley Roundabout and Westwood Roundabout, covering a distance of around 1,600 metres.

A616placeholder image
A616 | Google

Meanwhile, on the A616, laybys will be closed on both directions between Newton Chambers Roundabout and Flouch Roundabout, spanning approximately 17 kilometres.

The works are due to begin on Friday (May 1) and are expected to last for up to 11 months, or until completed. Closures will be in place between 9am and 8pm, and will only apply at times when works are being carried out.

The maintenance programme includes grass cutting, sign cleaning, gully emptying and sweeping along the routes.

Traffic signs will be used to indicate when laybys are closed, and the restrictions will not apply to emergency vehicles or those involved in the works.

The orders will come into force on Thursday (Apr 30) and can remain in place for a maximum of 18 months if required.

Related topics:
News you can trust since 1754
Follow us
© 2026 Iconic Media Group Ltd. All rights reserved.Cookie SettingsTerms and ConditionsPrivacy notice